Become a Biomass Supplier

Become a Biomass Supplier

Bord na Móna has a substantial annual biomass requirement to fuel its power plant at Edenderry Co. Offaly. The company is offering suppliers a continuous year round offtake with sustainable contracts.

Sawdust

Woodchip

Pulpwood

Forestry thinnings and residues

See below for Chipped Material Specification

This Specification covers Chipped Material suitable for Edenderry Power Plant - derived from Wood,
(Woodchip), Brash Material (Brash Chip).

Parameters Unit Basis Method Min Typical Max
Total Moisture % w.t As Rec’d. BS EN 14774 (2): 2009 20.00 Note 1
Ash % w.t Dry BS EN 14775: 2009 1.20 5.00
Gross Calorific Value MJ/kg Dry BS EN 14918: 2009 18.00 19.50 22.00
Dust % w.t 1mm screen EN 15149-1: 2010 - 1.00
Ultimate Analysis
Nitrogen % Dry BS EN 15104: 2011 0.50 1.00
Sulphur % Dry BS EN 15289(1): 2009 0.03 0.25
Trace Elements
Chlorine % Dry BS EN 15289: 2011 0.02 0.10
Sodium % Dry 0.02
Potassium % Dry 0.05
Ash Fusion
Initial Deformation Temperature (reducing) oC CEN/TS 15370-1: 2006 1100 1300 1500
Impurities
Foreign Matter(*) % wt As Rec’d Gravimetric Absent
Size
Wood Specification – P45 Note 2 mm As Rec’d 45
Bulk Density kg/m³ As Rec’d EN 15103: 2009 > 300
  1. Maximum Moisture % is not Defined – however as products are paid for on an Energy Basis
    delivery of Very High Moisture Content material e.g. 65% + will attract a reduced rate.
  2. Shredded Material containing long particles is not suitable for the plant as it can cause
    blockages within the fuel handling systems